RenoNext
Price CheckStart Project
Durham Region

Pickering Secondary Suite Guide

Pickering caps basement apartments at 100 m² and requires 3 on-site parking spaces — plan your project around these limits.

Permit Fees

$500 registration + building permit (varies)

Timeline

3-5 months from application to occupancy

Region

Durham Region

Overview

Pickering permits basement apartments in eligible residential dwellings with specific restrictions. The maximum size is 100 m² (1,076 sq ft), and the apartment must be smaller than the primary dwelling. Registration is mandatory ($500 fee).

Notable Pickering rules: minimum 3 on-site parking spaces required on the property, and home-based businesses are prohibited in either unit of a dwelling containing a basement apartment. These are stricter than most GTA municipalities.

Pickering Requirements

RequirementStandard
Ceiling Height
1.95 m (6'5") minimum
Fire Separation
1-hour fire-rated assembly
Egress Windows
0.35 m² unobstructed opening per bedroom
Parking
3 on-site parking spaces minimum
Electrical
Separate sub-panel + ESA permit
Plumbing
Verify drain capacity + backwater valve
HVAC
Independent heating or zone control
Zoning
Max 100 m² (1,076 sq ft), must be smaller than primary dwelling

Ontario Building Code Standards (Apply Everywhere)

These OBC requirements apply to all secondary suites in Ontario, regardless of municipality.

  • Fire Separation: 1-hour fire-rated ceiling assembly (Type X drywall)

    Required between dwelling units. 2024 OBC update: smoke-tight barriers may replace full fire separations in some configurations. Inspected before occupancy permit.

  • Egress Windows: Min 0.35 m² openable area per bedroom

    Bottom of opening max 1.5 m above floor. Must be rescuable from outside.

  • Electrical: Separate 100A panel minimum

    ESA inspection mandatory. AFCI breakers required for bedrooms.

  • Plumbing: Separate water meter + backwater valve

    Drainage must meet Part 7 standards. Backflow prevention required.

  • HVAC: Independent heating system OR zone control

    Ventilation: min 10 L/s per occupant. HRV recommended.

Permit Process

Step-by-step guide to getting your Pickering building permit

Total Timeline

3-5 months from application to occupancy

Permit Fees

$500 registration + building permit (varies)

1

Check Zoning

1-2 days

Verify your property zone allows basement apartments. Confirm parking (3 spaces required).

2

Prepare Drawings

1-3 weeks

Floor plans, sections, fire separation details, plumbing, electrical, HVAC.

3

Submit Building Permit

1 day

Submit to Pickering Building Department with drawings and fees.

4

Plan Review

4-8 weeks

City reviews for OBC, zoning, and fire code.

5

Construction + Inspections

8-12 weeks

Build per approved plans. Inspections at framing, insulation, electrical, plumbing, final.

6

Registration

1-2 weeks

Register basement apartment with the City. Pay $500 registration fee.

Incentives & Rebates

Federal and provincial programs that can help fund your secondary suite project. See all rebates available in Pickering

Canada Secondary Suite Loan

Up to $80,000 at 2% interest

Federal loan program. 15-year repayment.

Ontario Secondary Suite Incentive

Up to $40,000 forgivable

Rent at below-market rates for 5 years — loan forgiven at 20% per year.

Pro tip: You can stack federal and provincial programs for up to $120,000 in combined funding. Apply for federal programs first, then provincial.

Pickering-Specific Tips

  • Maximum apartment size: 100 m² (1,076 sq ft) — must be smaller than the primary dwelling.
  • Parking: 3 on-site spaces required — stricter than most GTA cities. Plan your driveway carefully.
  • Home-based business is prohibited in EITHER unit of a dwelling with a basement apartment.
  • Registration fee: $500. Register with the City after all inspections pass.
  • Pre-approved ADU designs available (shared program with Whitby) — saves $2,000–$4,000 in design fees.

Official Resources

Common Questions

Get a Quote for Your Pickering Basement Apartment

Connect with verified contractors who specialize in secondary suite construction. Escrow-protected payments, GPS-verified work, and permanent records.