RenoNext
Price CheckStart Project
fact_checkGPS-Verified Material Tracking

Digital Foreman

Log deliveries in under 60 seconds. GPS-stamped. Photo-verified. Compliance-checked.

When the trucks are rolling, your foreman needs to log fast — not fill out paper forms back at the trailer. Digital Foreman captures material type, quantity, supplier, GPS coordinates, and photo proof in one screen.

0

Modules

0t

Logged Today

0s

Per Entry

add_a_photoMaterial Entry

Log Deliveries in Under 60 Seconds

One screen. Material type, quantity, truck ID, photo proof — GPS coordinates and timestamp captured automatically. No paper forms, no back-at-the-trailer data entry.

  • check
    One-screen delivery entry with auto-GPS capture
  • check
    Photo proof of delivery with geospatial stamp
  • check
    Material type selection from project-specific catalog
  • check
    Truck ID and supplier tracking

New Delivery Entry

gps_fixedAuto-capture: 40.7128° N, 74.0060° W

Material Type

Structural Steel (Grade 50)

Quantity

14.5 TONS

Truck ID

local_shipping

TX-9902

add_a_photo

Capture Proof of Delivery

GPS-stamped verification photo

schedule

Timestamp

OCT 24, 2023 | 14:32:05 EST

person_pin_circle

Foreman

J. Anderson (ID: 8821)

fact_checkFinalize & Record Entry
inventoryMaterial Log

Every Delivery, Searchable & Verified

Bento-style dashboard with daily intake statistics, featured entries, and a full searchable delivery log.

inventory_2
verifiedVerified
DF-8829-XNov 24 08:14 AM

Rebar Type 4 (12mm)

Quantity14.5 Tonnes
SupplierIron-Core Logistics
location_onLAT 34.0522° N, LONG 118.2437° W

Today's Intake

242.8

Total Tonnes Logged

18

Verified

3

Pending

Recent Deliveries

inventory_2

Material

Ready-Mix Concrete C30

Amount

8.5

verifiedverified
inventory_2

Material

PVC Drainage 150mm

Amount

48 Units

pendingpending
inventory_2

Material

Crushed Aggregate 20mm

Amount

12.0 Tonnes

verifiedverified
photo_camera
verifiedVerified

Geospatial Stamp

N 79.9232° W 82.4101°14:32:01 UTC

Asset Hash

SH256: 8F2A...9C11

Material Specifications

Grade TypeIndustrial C40/50
Aggregate Size20mm Crushed
Slump ClassS3 (100-150mm)

18.42

Metric Tonnes

7.5

Cubic Metres

check_circle

ASTM C94 Certified

This material meets all structural load requirements as specified in project blueprint ARCH-802.

fact_checkVerification

GPS-Stamped Proof You Can Trust

Every delivery photo is geotagged, timestamped, and SHA-256 hashed. Material specs are cross-checked against project blueprints for automatic compliance verification.

  • check
    GPS coordinates and UTC timestamp on every photo
  • check
    SHA-256 asset hashing for tamper-proof records
  • check
    ASTM/CSA compliance checking against blueprints
  • check
    Digital receipt generation with material specs
receipt_longBilling & Invoicing

From Delivery to Invoice, Automated

Auto-generated invoices from verified deliveries, HST calculation, and fiscal period summaries.

Invoice #DF-8829

Authorized Digital Record

Gravel — Grade A

22.4 Tonnes @ $45.00/T

$1,008.00

Delivery Surcharge

Zone 4 — Heavy Logistics

$145.00

Site Processing

Standard Handling

$85.00

Subtotal$1,238.00
HST (13%)$160.94
Total Due$1,398.94

002547 882900 139894

Billing History

pending

#DF-8829

Oct 24, 2023 · Gravel Grade A — 22.4 Tonnes

$1,398.94

processing
check_circle

#DF-8791

Oct 18, 2023 · Concrete Paving

$4,250.00

paid
warning

#DF-8755

Oct 12, 2023 · Steel Reinforcements

$12,890.15

outstanding
check_circle

#DF-8740

Oct 05, 2023 · Equipment Rental

$840.00

paid

Fiscal Summary — October

$18,539.09

Paid Total

$5,648.94

Outstanding

$12,890.15

Stop Losing Deliveries to Paperwork

Digital Foreman gives your site crew GPS-verified material logging, automatic compliance checks, and invoice generation — all from one app that works offline.

gps_fixedGPS-Verified
photo_cameraPhoto Proof
verifiedSHA-256 Hashed
wifi_offOffline-First