RenoNext
Price CheckStart Project
location_onField Worker Mobile App

Built for the
crew on the ground.

GPS check-in, identity verification, project briefs, attendance history, and safety briefings — everything a field worker needs before, during, and after a shift.

Screens
4
GPS Accuracy
98%
Check-in Time
< 3s
Ready
Offline
Dashboard

Your Shift at a Glance

One screen shows assigned projects, check-in status, weekly progress, weather, and recent activity.

AF
FieldForce
notifications

Good Morning, Alex.

Ready for your shift at the North Site?

Shift Status: Not Started

North Industrial Complex

Active project assigned for today.

location_onCheck In
map
Weekly Hours32 / 40h
My Projects
foundation

Foundation Phase B

Harbor Gateway — 0.8km away

chevron_right
architecture

Steel Framework

Central Hub — 2.4km away

chevron_right
dashboardDashboard
inventory_2Projects
location_onCheck-in
historyProfile

Personalized for every worker

The dashboard adapts to each crew member — showing their assigned project, shift status, weekly hours, and local weather. No digging through menus.

location_on

One-tap GPS check-in

Start your shift with a single tap. Location verified automatically.

partly_cloudy_day

Live site weather

Temperature, wind, and conditions for your assigned site.

done_all

Activity timeline

See your recent shifts, reports, and completed tasks at a glance.

Core Screens

Four Screens, Zero Friction

Every screen is designed for field conditions — large touch targets, fast workflows, and offline-first reliability.

dashboard

Worker Dashboard

Your shift at a glance

A personalized home screen with check-in status, assigned projects, weekly hour progress, weather conditions, and recent activity — all before you leave your truck.

  • check_circleOne-tap GPS check-in with project assignment
  • check_circleWeekly hour tracker with progress bar
  • check_circleLive weather and site conditions
  • check_circleRecent activity feed with shift history
location_on

GPS Check-in

Verify presence, verify identity

Geofenced location verification paired with selfie-based identity confirmation. Tamper-proof, GPS-stamped, and logged to the second.

  • check_circleLive map with geofence boundary overlay
  • check_circleSelfie capture vs. reference photo match
  • check_circleGPS coordinates + accuracy percentage
  • check_circleSecure authentication before shift start
inventory_2

Project Details

Everything about the site

Full project briefs with satellite map preview, supervisor contact, site access logistics, safety briefing requirements, work order specs, and live weather.

  • check_circleSatellite map with GPS-verified address
  • check_circleSupervisor profile with one-tap contact
  • check_circleSafety briefing with hazard and PPE levels
  • check_circleWork order with scheduled start and finish
history

Attendance History

Every hour, accounted for

Complete attendance logs organized by day with check-in/check-out times, total hours, project assignment, and verification status.

  • check_circleMonthly summary with total hours and active days
  • check_circleDaily log cards with in/out timestamps
  • check_circleGPS-verified status badge on every entry
  • check_circlePrevious month archive with export
Deep Dive

Site Intel + Shift Records

Full project details before you step on site. Complete attendance logs after every shift.

Project Details

arrow_backFieldForce
notifications
Project ID: IRW-9042

North Ridge Substation B-4

Active Site
location_on8900 Industrial Way, Denver, CO
Site Supervisor
person

James Miller

Senior Project Lead

warning

Required Safety Briefing

High-voltage protocols & PPE verification

sunny
64°F

Clear Skies • Wind: 4mph

Optimal
location_onCheck In to Site
dashboardDashboard
inventory_2Projects
location_onCheck-in
historyProfile

Attendance History

person
FieldForce
notifications

Attendance History

Reviewing logs for October 2023

Total Hours
164.5
trending_up12% from last month
Days Active
21/24
verifiedAll verified
Daily Logs
Today, Oct 24

Bridge North Expansion

Verified
location_onSector 7-B, Industrial Park
In

08:00 AM

Out

05:30 PM

Total

9.5 hrs

Oct 23

Bridge North Expansion

Verified
location_onSector 7-B, Industrial Park
In

08:15 AM

Out

05:00 PM

Total

8.75 hrs

Oct 22

Warehouse Logistics Hub

Verified
location_onWestside Terminal
In

07:30 AM

Out

04:30 PM

Total

9.0 hrs

dashboardDashboard
inventory_2Projects
location_onCheck-in
historyProfile
person
FieldForce
notifications

Check-in

Verify your current site presence

Current Site

Sector 7 Construction Hub

98%
add_a_photoTake Selfie
face_retouching_natural
Reference
schedule

Shift Start Time

08:00 AM • Today

my_location

GPS Coordinates

41.8781° N, 87.6298° W

Verify Location & IdentitySecure Authentication Required
Identity + Location

Tamper-Proof
Check-in

Selfie verification matched against a reference photo, paired with GPS geofence confirmation. Every check-in is cryptographically stamped and impossible to fake.

location_onGPS geofence with 98% accuracy
face_retouching_naturalSelfie vs. reference photo match
scheduleTimestamped to the second
cloud_offWorks offline, syncs when connected
location_on

Equip Your Crew
with FieldForce

GPS check-in. Identity verification. Project briefs. Attendance logs. Safety briefings. One app for your entire field team.

location_onGPS Verified
face_retouching_naturalIdentity Match
shieldEncrypted
cloud_offOffline-Ready