RenoNext
Price CheckStart Project
health_and_safetyConstruction Safety App

Safety docs done
before the trucks arrive.

JSA forms, toolbox talks, equipment inspections, crew sign-off, and instant PDF export — everything your safety program needs, built for the field.

Templates
15
Form Types
5
Per Form
< 60s
Offline
100%
JSA Generator

From Template to Signed PDF

Pick a template, confirm the hazards, assign controls, collect crew signatures — done before the first truck arrives.

closeSITESAFE
JSA STEP 04

Edit Job Step

Define the task, identify hazards, and assign control measures

Excavation of trench for electrical conduit installation near Zone B structural footings.
Low
Medium
High
Contact with unidentified underground utility lines; soil instability due to recent rainfall.
Hand-digging within 1m of marked services. Continuous spotter presence.
🪖
🥽
🧤
add
saveSave Step
dashboardDashboard
assignmentForms
groupsCrew
folderDocs

Hazard-first workflow

Every JSA starts with the job steps. For each step, the app suggests common hazards from its database — your crew confirms or adds site-specific risks. Controls are auto-matched to each hazard, then the whole form is locked and signed.

library_books

15 trade-specific templates

Excavation, concrete, steel, electrical, general — ready to go.

warning

Risk-rated hazard matrix

High / Medium / Low ratings with color-coded badges on every step.

verified

Control auto-suggestions

Database of 200+ controls matched to hazard types. Edit or add your own.

Core Modules

Four Modules, Zero Paper

Every module is designed for field conditions — gloved hands, bright sun, and no Wi-Fi.

assignment

JSA Generator

Two-page forms in under 60 seconds

Pre-built templates for every trade. Select your task, confirm hazards, assign controls, and generate a two-page PDF — signed by every crew member before work starts.

  • check_circle15 industry-standard templates by trade
  • check_circleStep-by-step hazard identification with risk ratings
  • check_circleControl measures auto-suggested per hazard type
  • check_circleDigital crew signatures with timestamp
draw

Crew Sign-Off

Every name, every shift

Digital signature capture for toolbox talks, JSAs, and safety briefings. Each crew member signs on-screen with their name, trade, and timestamp — creating an auditable compliance record.

  • check_circleTouch-based signature capture on any device
  • check_circleAutomatic crew roster from project assignment
  • check_circleSignature status tracking (signed / pending / absent)
  • check_circleExportable sign-off sheets for MOL inspections
content_paste

Five Form Types

One app, every safety doc

JSA, Toolbox Talk, Scissor Lift Inspection, Forklift Pre-Op, and Fall Protection Plan — all built-in with field-tested layouts and auto-populated site data.

  • check_circleJSA with hazard matrix and crew sign-off
  • check_circleToolbox Talk with topic library and attendance
  • check_circleEquipment inspection checklists (scissor lift, forklift)
  • check_circleFall Protection Plans with anchor point documentation
picture_as_pdf

Instant PDF Export

Print-ready in one tap

Every form generates a professionally formatted PDF with company branding, digital signatures, timestamps, and GPS coordinates — ready for email, print, or MOL submission.

  • check_circleBranded PDF with company logo and project details
  • check_circleAll signatures embedded with date and time
  • check_circleGPS coordinates stamped on every document
  • check_circleEmail, share, or save to device instantly
Deep Dive

JSA Details + PPE & Sign-off

View complete JSA steps with hazard breakdown, then verify PPE and collect every crew member's signature before work begins.

JSA Details

arrow_backSITESAFE
more_vert
JSA #104Status: Active

Excavation and Trenching for Foundation

Project

Skyline Heights Phase II

Supervisor

Marcus Thorne

verified
Steps
PPE
Sign-off
Step 01Site Perimeter Check

Verify all utility markings, clearance zones, and underground service locations

Utility StrikeHigh Risk
Step 02Excavation Commencement

Begin trenching operations with spotter present and trench box ready

Cave-inCritical Risk
addAdd Step
homeHome
notificationsAlerts
personProfile

PPE & Sign-off

menuSITESAFEmore_vert
Site ID: #4492-BACTIVE SITE

PPE & Sign-off

Required verification before entering Zone 4

Required PPE
🪖Hard Hat
🦺Hi-Vis
🧤Gloves
🥽Goggles
👢Steel Toe
🎧Ears
Worker Sign-off
NN

Namer Names

Structural Lead

Tap to Sign
MS

Muher Smith

Site Inspector

Tap to Sign
homeHome
notificationsAlerts
personProfile
Complete Coverage

Five Form Types,
One App

Every safety document your site needs — from morning toolbox talks to equipment pre-op checklists. Each form type is purpose-built with field-tested layouts and auto-populated project data.

speedAverage completion time: 48 seconds
cloud_offWorks 100% offline — syncs later
historyFull audit trail on every form
translateEnglish and French support
assignment

Job Safety Analysis

JSA

Step-by-step hazard identification with controls and crew sign-off.

chevron_right
groups

Toolbox Talk

TBT

Pre-shift safety meeting with topic discussion and attendance.

chevron_right
vertical_align_top

Scissor Lift Inspection

SLI

Pre-operation checklist: guardrails, controls, tires, battery.

chevron_right
forklift

Forklift Pre-Op

FPO

Daily operator inspection: forks, mast, hydraulics, horn, lights.

chevron_right
swap_vert

Fall Protection Plan

FPP

Anchor points, harness check, rescue plan, and crew certification.

chevron_right
app.sitesafe.io/jsa/104
health_and_safety
SITESAFE
JSA Details
Required PPETeam Sign-offHistory

Projects > Downtown Commercial Hub > JSA-104-DCH

Excavation and Trenching for Foundation

picture_as_pdfExport PDF

Supervisor

Mark Reynolds

Date

Oct 24, 2023

Approved
StepPotential HazardsControl MeasuresRisk Level
01 Inspect area for underground utilitiesElectric shock, Gas leak, Service disruptionCall 811, Verify maps, Hand-dig 2ftMedium
02 Excavating trench with heavy machineryCave-in, Rollover, Falling debrisShoring, 2ft spoil pile, SpotterHigh

Required PPE

🪖Hard Hat
🦺Hi-Vis
🥽Goggles
🧤Gloves

Worker Sign-off

check_circle

James Lewis

Operator

check_circle

Tom Kincaid

Laborer

PDF Export + Analytics

Print-Ready,
MOL-Ready

Every form generates a professionally formatted PDF with embedded signatures, GPS coordinates, and project metadata. Email it, print it, or save it — your compliance record is always complete.

Forms This Week
24trending_up+8
Crew Compliance
97%trending_up+2%
Avg. Completion
48strending_up-12s
Open Issues
0
health_and_safety

Eliminate Paper
Safety Forms Today

JSA forms, toolbox talks, equipment inspections, crew sign-off, and instant PDF export — all in one app, built for the field.

verified_userWSIB Compliant
gavelMOL Ready
cloud_offOffline-First
lockEncrypted